Way Ne Hardware Supply
Sdn Bhd
No. 243, Jalan Kapar, Batu Belah, 41400 Klang, Selangor Darul Ehsan, Malaysia.
+603-3290 4366
Ms Apple Lim
+6019-2147200
Wayne
+6013-6237200
Ms Apple Lim
+6019-2147200
Wayne
+6013-6237200
Scaffolding Assembly
Scaffolding Assembly
Wooden Planks / Sole Plate Clean site and lay the wooden planks at the ground in horizontal position |
---|
Jack Base It is a seat for adjusting the required scaffolding level above the wooden planks |
Main Frame Insert the main frame into jack base section in perpendicular |
Cross Base For fixing the main frame in each span of scaffolding |
Arm Lock It is being used to hold frames between lifts to prevent uplifting |
Joint Pin Insert onto the top of main frame for fixing the upper frame |
Horizontal Frame / Walking Board It is a lateral pipe frame used to hook onto the main frame |
Wall Tie Use wall tie to prevent the frames from tilting or collapsing |